Despite the heavy rain in the morning, the weather cleared up to allow the raft to be poured. Between the house and the garage it took approximately 65 meters of concrete.
For my geothermal systems i left out 2 lengths of 6 inch wavin pipe in my utility room. This was inserted at an angle of 45 degrees too allow any sort of system get into the house.
The photo above doesn't show the concrete too well so i'll upload another one later.
Next step, is to get ready for blocks.